tender

Sl. No. Tender No Title Download
1 Contract UG-ECS Addendum no.2 download
2 Tender SMLJ/DSM/07 Addendum 1 & Reply to Queries download
3 Contract UG-ECS Volume-6 editable (incorporating Addendum no.1) download
4 Contract UG-ECS Volume-6 (incorporating Addendum no.1) download
5 Contract UG-ECS Volume-3 pt. 1 (incorporating Addendum no.1) download
6 Contract UG-ECS Volume-2 (incorporating Addendum no.1) download
7 Contract UG-ECS Volume-1 (incorporating Addendum no.1) download
8 Contract UG-ECS Reply to pre bid queries download
9 Contract UG-ECS Addendum no.1 download
10 CONTRACT - BPEL DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF BATTERY POWERED ELECTRIC LOCO FOR CENTRAL PARK DEPOT download
11 CONTRACT - SMLJ DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF SYNCHRONIZED MOBILE LIFTING JACKS FOR CENTRAL PARK DEPOT download
12 Contact ATWP Addendum 2 download
13 CONTRACT ATWP Addendum 1 download
14 Tender No. UFWL/DSM/02 Addendum No. 3 download
15 Tender No. RRE/DSM/06 Addendum No. 3 download
16 Tender No. EBT/DSM/05 Addendum No. 3 download
17 Tender No. BTT/DSM/03 Addendum No. 3 download
18 CONTRACT: UG/EL-L&E (R) Addendum No. 4 download
19 CONTRACT – UG/EL-L & E (R) CLARIFICATIONS TO PRE - BID QUERIES download
20 CONTRACT: UG/EL-L & E (R) CLARIFICATIONS TO PRE - BID QUERIES download
21 CONTRACT: UG/EL-L & E (R) Addendum No. 3 download
22 Contract –RRE Addendum No. 2 download
23 Contract – EBT Addendum No. 2 download
24 Contract – UFWL Addendum No. 2 download
25 Contract – BTT Addendum No. 2 download
26 CONTRACT: UG/EL-L&E (R) Addendum No. 2 download
27 CONTRACT UG-TVS (R) Addendum No. 2 download
28 CONTRACT ATWP Tender documents download
29 Contract UG ECS NOTICE INVITING TENDER download
30 UFWL Addendum & Reply to Queries download
31 RRE Addendum & Reply to Queries download
32 EBT Addendum & Reply to Queries download
33 BTT Addendum & Reply to Queries download
34 UG/EL-L & E (R) CLARIFICATIONS download
35 UG/EL-L & E (R) Addendum 1 download
36 UG-E&M (R): ADDENDUM NO. 3 Design Verification, Detailed Engineering, manufacture, delivery and storage at site, laying, installation, testing (including integrated testing and commissioning), Demonstration of Performance of System/ Equipment of E&M inclusive of Fire Protection system for Underground Section of Kolkata Metro East-West Line (Phase -1) download
37 Contract UG-TVS (R) Reply to pre-bid queries download
38 Contract UG-TVS (R) Addendum no.1 download
39 KMRCL/contract/CFWL/DSM/02 Revised date for Addendum, Bid Submission and opening shall be notified shortly.
40 KMRCL/contract/RRE/DSM/06 Revised date for Addendum, Bid Submission and opening shall be notified shortly.
41 KMRCL/contract/BTT/DSM/03 Revised date for Addendum, Bid Submission and opening shall be notified shortly.
42 KMRCL/contract/EBT/DSM/05 Revised date for Addendum, Bid Submission and opening shall be notified shortly.
43 UG-E&M(R) Addendum No. 2 download
44 UG/EL-L&E(R) Deferment of date for issue of ‘Reply to Queries from Bidders’: contract UG/EL-L&E(R) download
45 CONTRACT – BTT & UFWL Revised date for submission and opening of tender BTT & UFWL shall be notified shortly
46 CONTRACT : UG-E&M(R) CLARIFICATIONS TO PRE - BID QUERIES download
47 CONTRACT: UG-E&M(R) Addendum 1 download
48 UG-E&M(R) Notice for Deferment of Tender submission date download
49 Notification For Tender Contract-EBT, please read Date and Time of opening of Tender :\"10.03.2017 at 14.30 Hrs\" instead of \"10.03.2016 at 14.30 Hrs\"
50 CONTRACT - EBT DESIGN, MANUFACTURE, SUPPLY, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF ELECTRIC BOGIE TRACTOR FOR CENTRAL PARK DEPOT download
51 CONTRACT – RRE DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND TRAINING OF PERSONNEL FOR RE-RAILING & RESCUE EQUIPMENT FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
52 CONTRACT: UG-E&M (R) NOTICE FOR PROSPECTIVE BIDDERS download
53 CONTRACT – UG/EL- L & E (R) Instruction to download : Download part 1 & 2 in same folder and unzip part 1 to exract
54 CONTRACT – UG/EL- L & E (R) (Part 2 of 2) DETAILED DESIGN, DETAIL ENGINEERING, PROTOTYPE, MANUFACTURE, SUPPLY, DELIVERY AND STORAGE AT SITE, INSTALLATION, TESTING AND COMMISSIONING (INCLUDING INTEGRATED TESTING & COMMISSIONING), TRAINING OF PERSONNEL, DEMONSTRATION OF PERFORMANCE OFSYSTEM/ EQUIPMENT & ANNUAL MAINTENANCE CONTRACT OF LIFTS & ESCALATORS (L & E) OF TWO UNDERGROUND AND SIX ELEVATED STATIONS OF KOLKATA METRO EAST-WEST LINE PROJECT (PHASE 1) download
55 CONTRACT – UG/EL- L & E (R) (Part 1 of 2) DETAILED DESIGN, DETAIL ENGINEERING, PROTOTYPE, MANUFACTURE, SUPPLY, DELIVERY AND STORAGE AT SITE, INSTALLATION, TESTING AND COMMISSIONING (INCLUDING INTEGRATED TESTING & COMMISSIONING), TRAINING OF PERSONNEL, DEMONSTRATION OF PERFORMANCE OFSYSTEM/ EQUIPMENT & ANNUAL MAINTENANCE CONTRACT OF LIFTS & ESCALATORS (L & E) OF TWO UNDERGROUND AND SIX ELEVATED STATIONS OF KOLKATA METRO EAST-WEST LINE PROJECT (PHASE 1) download
56 CONTRACT – UFWL DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING&COMMISSIONING AND TRAINING OF PERSONNEL FOR FULLY AUTOMATIC CNC UNDER FLOOR WHEEL LATHE FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
57 CONTRACT – BTT DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL FOR BOGIE TURN TABLE FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
58 Civil/1 of 2016-2017 Construction/Maintenance to Building or any structure, Sanitary and plumbing work in connection with East-West Metro Project of KMRCL including maintenance work (Civil) of KMRCL Bhawan. download
59 UG-TVS (R) Deferment of tender submission date of contract UG-TVS (R) download
60 CONTRACT - UG-E&M (R) Design Verification, Detailed Engineering, Manufacture, Delivery and storage at site, Laying, Installation, Testing and Commissioning (including integrated testing and commissioning), Demonstration of Performance of System/ Equipment of Electrical & Mechanical (E&M) inclusive of Fire Protection systems for Underground Section of Kolkata Metro East West Line (Phase-1) download
61 CONTRACT RS (3R) for DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND INTEGRATION OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS), AND TRAINING OF PERSONNEL TENDER AWARD NOTICE download
62 Civil/3 of 2015-2016 Construction/Maintenance to Road in connection with East-West Metro Project of KMRCL and blanketing work for wheel lathe line, Coach unloading area etc.at Central Park Depot. download
63 Civil/2 of 2015-2016 Construction/Maintenance to Building or any structure, Sanitary and plumbing work in connection with East-West Metro Project of KMRCL including maintenance work (Civil) of KMRCL Bhawan. download
64 Tender No. – Civil/3 of 2015-2016 Construction/Maintenance to Road in connection with East-West Metro Project of KMRCL and blanketing work for wheel lathe line, Coach unloading area etc.at Central Park Depot. download
65 Tender No. – Civil/2 of 2015-2016 Construction/Maintenance to Building or any structure, Sanitary and plumbing work in connection with East-West Metro Project of KMRCL including maintenance work (Civil) of KMRCL Bhawan. download
66 - KMRC(GM)-545/IP-8/2014 Hiring of 6(Six) no. Diesel driven road vehicle for KMRCL at Kolkata under the jurisdiction of KMRC/Kolkata. download
67 NIT NO : CIVIL/1 OF 2015-16 Addendum 3 download
68 NIT NO. Civil/1 of 2015-16_Addendum no. 3 Architectural Finishing, Plumbing, Tubewell, VAC, Electrical, Fire Fighting Works for 6 Elevated Stations including lighting of Viaduct & lighting of TSS/ASS of Car Depot and RCC Structural roof over Platform of Sector-V Station of East West Corridor of K download
69 Addendum 2/Civil/1/ 2015-16 Addendum 2 for Civil/1 of 2015-16 download
70 Addendum 1 Architectural Finishing, Plumbing, Tubewell, VAC, Electrical, Fire Fighting works for 6 Elevated Stations including lighting of Viaduct & Lighting of TSS/ASS of Car Depot and RCC Structural roof over Platform of Sector-V Station of East West Corridor of K download
71 N.I.T. No. - Civil /1 of 2015-16 Architectural Finishing, Plumbing, Tubewell, VAC, Electrical, Fire Fighting works for 6 Elevated Stations including lighting of Viaduct & Lighting of TSS/ASS of Car Depot and RCC Structural roof over Platform of Sector-V Station of East West Corridor of K download
72 CONTRACT RS (3R) Exchange rate to be considered for RS (3R) Contract download
73 Addendum 2 of Contract RS (3R) Vol 1 Addendum 2 of Contract RS (3R) Vol 1 download
74 CONTRACT RS (3R) Addendum -2 download
75 CONTRACT RS (3R) (vol 6) AMENDED VERSION of CONTRACT RS (3R) for DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND INTEGRATION OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS), AND TRAINING OF PERSONNEL download
76 CONTRACT RS (3R) ( vol 3 part 2) AMENDED VERSION of CONTRACT RS (3R) for DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND INTEGRATION OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS), AND TRAINING OF PERSONNEL download
77 CONTRACT RS (3R) (vol 2) AMENDED VERSION of CONTRACT RS (3R) for DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND INTEGRATION OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS), AND TRAINING OF PERSONNEL download
78 CONTRACT RS (3R) (vol 1) AMENDED VERSION of CONTRACT RS (3R) for DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND INTEGRATION OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS), AND TRAINING OF PERSONNEL download
79 CONTRACT RS (3R) Contractual Addendum, Technical Addendum and Reply to Queries download
80 N.I.T. No. - Civil /1 of 2015-16 Cancellation of tender download
81 Civil/1 of 2015-16 Architectural finishing works and plumbing works for six elevated stations download
82 NIT No 4- Civil/4 of 2014-2015 Internal Modification in 3rd Floor of KMRCL Bhawan download
83 Addendum No 1 of N.I.T No. - Civil/3 of 2014 of 2015 Construction of boundary wall etc. and restoration of construction site of East West Metro near Swabhumi download
84 N.I.T No. - Civil/3 of 2014 of 2015 Construction of boundary wall etc. and restoration of construction site of East West Metro near Swabhumi download
85 CONTRACT RS (3R) DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND INTEGRATION OF PASSENGER ROLLING STOCK (ELECTRICAL MULTIPLE UNITS), AND TRAINING OF PERSONNEL (Vol : 1,2,3 (part 1 &2),4,5,6,7 download
86 Addendum 1 , NIT NO. Civil/2 Construction of foundation for infloor lift pit in workshop at central park depot download
87 Addendum No. 1 NIT No. Civil/1 Construction of brick wall along periphery of concourse level for safety purpose for all 6(six) elevated stations. download
88 NIT No. Civil/2 of 2014-15 Construction of foundation for infloor lift pit in workshop at central park depot download
89 NIT No. Civil/1 of 2014-15 Construction of brick wall along periphery of concourse level for safety purpose for all 6(six) elevated stations. download
90 Contract - UFWL \"Contrcat - UFWL\" has been discharged download
91 Addendum No. 4 for EWE-2(R1) Design, Construction of 365.646m viaduct from (Ch 8958.405m to 9324.051m) connecting Via-duct constructed on either side along the Elevated Section of East West Corridor of Kolkata Metro download
92 Addendum No. 3 for EWE-2(R1) Design, Construction of 365.646m viaduct from (Ch 8958.405m to 9324.051m) connecting Via-duct constructed on either side along the Elevated Section of East West Corridor of Kolkata Metro download
93 NIQ No Civil/1 of 2014-2015 of Managing Director/KMRCL Inspection & witnessing of tests for HH Rails & Overseas components of Ballastless Track Fastening at Austria, China & U.K in connection with Phase-I of Kolkata East West Metro Corridor under KMRCL as per QAP enclosed download
94 Contract EWE-2(R1) Addendum No 2 download
95 EWE-2(R1) Pre-bid Queries/ Clarifications download
96 EWE-2R1 ( Addendum No 1) Design, Construction of 365.646m viaduct from (Ch 8958.405m to 9324.051m) connecting Via-duct constructed on either side along the Elevated Section of East West Corridor of Kolkata Metro download
97 NIT No: Civil/6 of 2014-15 Design, Construction of 365.646m viaduct from (Ch 8958.405m to 9324.051m) connecting Via-duct constructed on either side along the Elevated Section of East West Corridor of Kolkata Metro download
98 Contract ISA 2R: Re-sheduled Date of Tender submission Contract ISA 2R: Re-sheduled Date of Tender submission download
99 N.I.T No. Civil/5 of 2013-2014 of the Managing Director, KMRCL Construction of Two nos. (G+6) storied Building for permanent rehabilitation of dwellers in Duttabad Settlement falling on the alignment of Elevated Viaduct from P37 to P50 including Sanitary & Plumbing and Electrification works under Kolkata Metro rail C download
100 Contract - UFWL Addendum -3. of Contract: UFWL download
101 Contract - IFPJ Addendum -3. of Contract: IFPJ download
102 Corrigendum no. 2 to Addendum -2. of Contract: IFPJ Corrigendum no. 2 to Addendum -2. of Contract: IFPJ download
103 Corrigendum no.2 to Addendum -2. of Contract: UFWL Corrigendum no.2 to Addendum -2. of Contract: UFWL download
104 Corrigendum to Addendum 2: Contract UFWL / IFPJ Corrigendum to Addendum 2: Contract UFWL / IFPJ download
105 ADDENDUM NO. 2 (UFWL) No 2 of Tender document for tender CONTRACT-UFWL for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF UNDER FLOOR WHEEL LATHE. download
106 ADDENDUM NO. 2 (IFPJ) Addendum No 2 of Tender document for tender CONTRACT-IFPJ for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF IN-FLOOR PIT JACK. download
107 UFWL - Reply to Queries UFWL - Reply to Queries download
108 IFPJ- Reply to Queries IFPJ- Reply to Queries download
109 KMRCL- Contract ISA ( 2 R) Independent Safety Assessment for Train Control and Signalling system for Kolkata East-West Metro line - Contract ISA(2R) download
110 Replies to Prebid Queries . Contract Package : EWSAF-[R]/P-1 Building Finishing works- brickwork, Plastering. Doors/Windows and Painting Work for Six Elevated Stations of Kolkata East West Metro Project download
111 Addendum 2 contract pkg EWSAF-[R]/P-1 Building Finishing works- brickwork, Plastering. Doors/Windows and Painting Work for Six Elevated Stations of Kolkata East West Metro Project download
112 Addendum-1 Contract No - IFPJ Addendum-1 Contract No - IFPJ download
113 Addendum-1 Contract No - UFWL Addendum-1 Contract No - UFWL download
114 ISA(R) KMRCL TENDER NO ISA(R) IS HEREBY CANCELLED
115 ISA(R)- Notice Notice download
116 Addendum-1 Contract No. EWSAF-(R)/P-I Building Finishing Work- Brickwork, Plastering, Doors/windows and painting work for six Elevated Stations at Kolkata East West Metro Project download
117 NIT No: Civil/4 of 2013-14 Building Finishing Work- Brickwork, Plastering, Doors/windows and painting work for six Elevated Stations at Kolkata East West Metro Project download
118 KMRCL- Contract ISA (R) Independent Safety Assessment for Train Control & Signalling system download
119 CONTRACT – UFWL DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF UNDER FLOOR WHEEL LATHE FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED. download
120 CONTRACT – IFPJ DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF FULLY AUTOMATIC IN-FLOOR PIT JACK FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
121 EWE-2[R] Addendum 4 download
122 NIT No. CIVIL/3 of 2013-14 Construction of Temporary Units for Rehabilitation of Dwellers in Duttabad Settlement download
123 Addendum No 3 Name of the work of \"Design, construction of 365.646m Viaduct from (Ch 8958.405m to 9324.051m) connecting via-duct constructed on either side along the Elevated Station of East-West corridor of Kolkata Metro download
124 N. I. T. No. – Civil/2 of 2013 - 2014 Construction of Blanketing work for ballasted track in Central Park Depot in Salt Lake under Kolkata Metro Rail Corporation Limited download
125 NIT No: Civil/1 of 2013-14 Addendum-2 (Design & Construction of 365.646 Meter Elevated Viaduct from (Ch. M 8958.405 to M 9324.051) download
126 Contract EWE-2R Addendum-2 download
127 Contract- ATWP/HWP/BTT/SMLJ/UFWL Tender Discharge Notice download
128 CONTRACT NO: EWE-2[R] Addendum-1 download
129 CONTRACT NO: EWE-2[R] Design, Construction of 365.646m Viaduct from (Ch. 8958.405m to 9324.051m) connecting Via-duct constructed on either side along the Elevated Section of East West Corridor of Kolkata Metro download
130 NIT NO CIVIL-1/2013-14 Design, Construction of 365.646m Viaduct from (Ch. 8958.405m to 9324.051m) connecting Via-duct constructed on either side along the Elevated Section of East West Corridor of Kolkata Metro download
131 Addendum 3 & Reply to Queries - UFWL Addendum 3 & Reply to Queries - UFWL download
132 Addendum 3 & Reply to Queries - ATWP Addendum 3 & Reply to Queries - ATWP download
133 Addendum 3 & Reply to Queries - SMLJ Addendum 3 & Reply to Queries - SMLJ download
134 Addendum 3 & Reply to Queries - HWP Addendum 3 & Reply to Queries - HWP download
135 Addendum 3 & Reply to Queries - BTT Addendum 3 & Reply to Queries - BT download
136 Addendum No 2 of Tender document for tender CONTRACT-UFWL Addendum No 2 of Tender document for tender CONTRACT-UFWL for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF UNDERFLOOR WHEEL LATHE INCLUDING ELECTRIC BOGIE TRACTOR download
137 Addendum No 2 of Tender document for tender CONTRACT-SMLJ Addendum No 2 of Tender document for tender CONTRACT-SMLJ for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF SYNCHRONISED MOBILE LIFTING JACK download
138 Addendum No 2 of Tender document for tender CONTRACT-HWP Addendum No 2 of Tender document for tender CONTRACT-HWP for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF HYDRAULIC WHEEL PRESS download
139 Addendum No 2 of Tender document for tender CONTRACT-BTT Addendum No 2 of Tender document for tender CONTRACT-BTT for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF BOGIE TURN TABLE download
140 Addendum No 2 of Tender document for tender CONTRACT-ATWP Addendum No 2 of Tender document for tender CONTRACT-ATWP for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF AUTOMATIC TRAIN WASH PLANT. download
141 Addendum No 1 of Tender document for tender CONTRACT-UFWL Addendum No 1 of Tender document for tender CONTRACT-UFWL for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF UNDERFLOOR WHEEL LATHE INCLUDING ELECTRIC BOGIE TRACTOR download
142 Addendum No 1 of Tender document for tender CONTRACT-SMLJ Addendum No 1 of Tender document for tender CONTRACT-SMLJ for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF SYNCHRONISED MOBILE LIFTING JACK download
143 Addendum No 1 of Tender document for tender CONTRACT-HWP Addendum No 1 of Tender document for tender CONTRACT-HWP for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF HYDRAULIC WHEEL PRESS download
144 Addendum No 1 of Tender document for tender CONTRACT-BTT Addendum No 1 of Tender document for tender CONTRACT-BTT for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF BOGIE TURN TABLE download
145 CONTRACT-ATWP for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF AUTOMATIC TRAIN WASH PLANT. Addendum No 1 of Tender document for tender CONTRACT-ATWP for DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF AUTOMATIC TRAIN WASH PLANT. download
146 KMRC/FA/060/2BB-5/2009 DT 4.04.2013 Short Term Deposit of Rs 30 Cr download
147 CONTRACT- HWP DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF HYDRAULIC WHEEL PRESS FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LTD download
148 CONTRACT – UFWL DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF UNDERFLOOR WHEEL LATHE INCLUDING ELECTRIC BOGIE TRACTOR FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
149 CONTRACT – SMLJ DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF SYNCHRONISED MOBILE LIFTING JACK FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
150 CONTRACT – BTT DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF BOGIE TURN TABLE FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
151 CONTRACT – ATWP DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING AND TRAINING OF PERSONNEL OF AUTOMATIC TRAIN WASH PLANT FOR CENTRAL PARK DEPOT OF KOLKATA METRO RAIL CORPORATION LIMITED download
152 CORRIGENDUM-2 OF ISA CORRIGENDUM-2 OF INDEPENDENT SAFETY ASSESSMENT FOR TRAIN CONTROL & SIGNALLING SYSTEM download
153 Notice for Short Term Deposit Notice for Short Term Deposit download
154 N. I. T. No. –Civil/4 of 2012 - 2013 Addendum-I of N. I. T. No. –Civil/4 of 2012 - 2013 download
155 N. I. T. No. –Civil/4 of 2012 - 2013 Construction of 5 no Four Storied buildings for permanent rehabilitation of dwellers in Duttabad Settlement falling on the alignment of Elevated Viaduct from P37 to P50 including Sanitary & Plumbing and Electrification works under Kolkata Metro Rail Cor download
156 N. I. T. No. –Civil/3 of 2012 - 2013 Addendum No-1 of N. I. T. No. –Civil/3 of 2012 - 2013 download
157 Clarification to Queries :TENDER NO: KMRC/S&T/IT/NETWORK/12-13(R-2) TENDER FOR IMPLEMENTATION OF WIRED AND WIRELESS DATA NETWORK AND WIRED VOICE NETWORK (R-2) download
158 CORRIGENDUM-1 OF ISA CORRIGENDUM-1 OF INDEPENDENT SAFETY ASSESSMENT FOR TRAIN CONTROL & SIGNALLING SYSTEM download
159 NIT No. Civil /3 of 2012-2013 Architectural Finishing and Plumbing works for Six Elevated stations of East West Metro Project of KMRCL. download
160 TENDER NO: KMRC/S&T/IT/NETWORK/12-13(R-2) TENDER FOR IMPLEMENTATION OF WIRED AND WIRELESS DATA NETWORK AND WIRED VOICE NETWORK (R-2) download
161 Civil/2 of 2012 - 2013 Construction of Superstructure of G+4 Building including Structure, Woodwork, Sanitary & Plumbing, Drainage, Electrical etc for permanent Rehabilitation of Habitants falling on the alignment from P3 – P6 of the proposed East-West Metro Elevated Viaduct download
162 Civil/1 of 2012 - 2013 Design, Fabrication, Supply & Erection of Prefabricated Steel Roof Structure including Roof Portals, Purlins, Sheeting etc. for Six Elevated stations, Two Foot Over Bridges for One station and Cable Runner for One Station of East West Metro Project, Kolka download
163 Addendum No 1 for ISA Addendum No 1 along with clarification to queries of Independent Safety Assessment for Train Control & Signalling System download
164 ISA INDEPENDENT SAFETY ASSESSMENT FOR TRAIN CONTROL & SIGNALLING SYSTEM download
165 Addendum -2 : TENDER NO: KMRC/S&T/IT/NETWORK/12-13(R) TENDER FOR IMPLEMENTATION OF WIRED AND WIRELESS DATA NETWORK AND WIRED VOICE NETWORK (R-1) download
166 TENDER NO: KMRC/S&T/IT/NETWORK/12-13(R) change in date download
167 Addendum-1 for TENDER NO: KMRC/S&T/IT/NETWORK/12-13(R) TENDER FOR IMPLEMENTATION OF WIRED AND WIRELESS DATA NETWORK AND WIRED VOICE NETWORK (R-1) download
168 RS(2R) (Details of Award) Design,Manufacture, Supply, Testing, Commissioning and integration of Passenger Rolling Stock download
169 TENDER NO: KMRC/S&T/IT/NETWORK/12-13(R) TENDER FOR IMPLEMENTATION OF WIRED AND WIRELESS DATA NETWORK AND WIRED VOICE NETWORK (R-1) download