Out of the total permanent requirement of 22.60 Ha of land, 21.52 Ha is Government land. Private Land to be acquired will be for 1.08 Ha only. Elevated alignment is mostly proposed to be located on the median verge of the road.
Copyright Kolkata Metro Rail Corporation (KMRC). All rights reserved.